In reply to pres589 (djronnebaum) :
If you mean close to done, then not far. It IS a Miata and the stock seats, carpet and dash make up most of the interior decorating and are done. Door handles and window cranks are a good idea, but minutes away from being done when I get to them. The full inside HVAC stuff is installed and I have fan and defrost, so all good there.
The headliner is the one big item to install and other than time and contortions not a big deal. Then I run into making custom bits to deal with the areas where the two cars meet. A good example is the place where the rear Miata bulkhead seem between the seats needs to merge with the flat deck. I have spare vinyl that matches the seats to do anything that requires that and the dash can get re-colored to match the seats...lots of little stuff like that. There is wiring that runs across the car at that point and an elegant trim piece needs to be crafted to blend the two zones and still allow access to the wires.
The rear cargo area has the original faded carpet in place as of now and a rubber mat is covering the flat area. Stuff like an elegant way to cover the battery and remake the carpet 2" longer to meet the new deck need to be done. Blending the seatbelt towers in is another example of the interior work to be done.
In the short tem, just gonna get used to driving it in an expanding set of circumstances until I take that part for granted. First HWY drive is going to be a revelation.